What a Level 2 install includes
Level 2 charging runs at 240 volts and usually fills a car overnight. The install covers:
- A load check on your panel and service size.
- A dedicated breaker, usually 40 A or 60 A, and the cable run to where you park.
- Mounting and connecting the charger, then a test charge.
- The ESA notification and inspection.

What to send us first
The car, the charger model if you have one, and a photo of the panel with the door open. That is usually enough to size the job.
Garages, carports and driveways
Many north Etobicoke semis and bungalows have a carport or a driveway beside the house instead of a garage. An outdoor-rated charger mounts on the exterior wall closest to the parking spot, with the run sealed where it leaves the house.
Where the panel is on the far side of the basement, the cable run is the main part of the job. In a finished basement we plan the route to avoid opening ceilings where we can.
Townhouse complexes and condos have their own rules. The board or property manager decides where power comes from and how it is metered, so we work to their requirements.

When the panel is near its limit
On a 100 A service a charger may not fit alongside everything else on paper. A load management device can pause the charger while other big loads run, which often avoids an upgrade. If it does not, see panel upgrades.
What changes the price
- Distance from the panel to the parking spot.
- Interior or exterior mounting, and walls to pass through.
- Panel space, load management or an upgrade.
- The charger, if we supply it.
Questions
How fast is Level 2 charging?
It depends on the car and the charger, but most cars refill overnight from a 40 A or 60 A circuit.
Do I need a 60 A circuit?
Only if the charger and the car can use 48 A. Many cars accept less, and a 40 A circuit is cheaper and easier on the panel.
Is the install inspected?
Yes. It is filed with the Electrical Safety Authority and inspected.
Want a charger at home?
Tell us the car, where you park and how far that is from the panel. We will tell you what the install involves before we come out.