Repair, new panel or service upgrade?
Not every tripping breaker means a new panel. We start by finding out why it trips:
- One circuit trips: usually a fault or overload on that circuit, fixed as a repair.
- Several trip when big loads overlap: the service may be too small for the house as it is used now.
- A fuse panel or a panel with no spare spaces: replacement is usually the practical answer.
- Heat marks or corrosion inside: the panel needs attention before anything is added.

If the panel is hot or smells
Switch off the main if it is safe to reach and call. Heat at a panel is not something to wait on.
How a service upgrade runs
For a 100 A to 200 A upgrade the steps are:
- Load calculation. Sized to the house and what you plan to add, using the Ontario Electrical Safety Code method.
- ESA notification. Filed with the Electrical Safety Authority before work starts.
- Toronto Hydro. They disconnect and reconnect the service, so the date is set with them.
- Replacement. Meter base, mast or service cable where needed, new panel and main breaker, circuits reconnected and labelled.
- Inspection. ESA inspects, Toronto Hydro reconnects and we test every circuit.

Rexdale, Thistletown and north Etobicoke homes
A lot of the 1960s and 70s semis, bungalows and townhouses in Rexdale, Thistletown and Kingsview Village were built with 100 A services that were fine for the time. Add central air, a basement apartment and an induction range and that service is often at its limit.
Basement units are the most common reason for an upgrade we see here: a second kitchen and laundry need their own circuits, and the panel rarely has the space. Planning the panel with the renovation keeps the inspection simple.
Newer homes in Humberwood and West Humber-Clairville usually have 200 A already, so the question there is panel space rather than service size.
What changes the price
- Panel replacement only, or a full service upgrade with meter base and mast.
- Overhead or underground service.
- Circuits that need correcting or extending to the new panel.
- Finished walls or ceilings around the panel.
Questions
Are fuse panels still allowed?
Existing fuse panels are not automatically illegal, but many insurers ask for them to be replaced, and they leave no room to add circuits.
How long is the power off?
Most of a day for a service upgrade, from the morning disconnect to reconnection after inspection.
Can I add a basement unit on 100 A?
Sometimes, depending on the load calculation. Often the answer is a 200 A service, especially with electric heat or a second laundry.
Do you pull the permit?
Yes. The work is filed with the Electrical Safety Authority and inspected.
Breakers tripping or planning a basement unit?
Describe what trips and when, or what you are adding. A photo of the panel with the door open lets us tell you which kind of job it is before we come.